PV acceptance testing
Technical inspection before the handover of your photovoltaic system – as the basis for a well-founded acceptance decision.
We support clients, operators and EPCs in recording the condition of the system in a traceable way before handover. Existing documents, visible workmanship and agreed tests are considered together.
Reasons for inspection
Clarifying open points before handover
An acceptance inspection focuses on whether workmanship and documentation meet the agreed technical requirements and which points still need to be dealt with.
01
Pre-acceptance
The status of workmanship and documentation can be checked even before the actual acceptance date. Open points are named while there is still time to deal with them.
02
Acceptance support
At handover, the completed system is compared with the planning and test documents provided. Anomalies are clearly described and assigned – including after an extension or a replacement of components.
03
Follow-up acceptance
Deviations already identified can be examined again in an agreed follow-up inspection. This documents which points have been resolved and which are still open.
Scope of services
Considering documents and workmanship together
The scope of inspection is determined on the basis of system size, accessibility and handover status. Among other things, mounting, cable routing, labelling and the completeness of the documents are checked. Possible components are:
- Review of system plans, data sheets and existing test records
- Visual inspection of accessible modules, cable routes and electrical components
- Comparison of selected details of workmanship with the agreed requirements
- Supplementary electrical measurements and thermography to the agreed extent
- Photo documentation and structured recording of deviations identified
Result
An orderly basis for handover
The inspection report describes the areas inspected and the findings established. Deviations are documented in such a way that they can be assigned and dealt with as the project continues. Missing evidence and areas that could not be inspected are also named.
The technical inspection is tailored to the specific assignment. It supports your acceptance decision; it does not constitute an unverified confirmation of the entire system.
Working together
Coordinating inspection and handover date sensibly
01
Preparing the inspection
Existing documents, project status and handover date are reviewed. We clarify access, contact persons and the agreed scope of inspection.
02
Examining the system
The on-site inspection is carried out on the basis of the defined tasks. Relevant findings are recorded in photographs and in writing.
03
Dealing with open points
You receive a structured report. If required, a follow-up inspection of the agreed remedial work can be added.
Your enquiry
Is the handover of your system coming up?
Please state the location, system size, construction progress and the planned acceptance date. Existing plans and test records make preparation easier.
Frequently asked questions
Questions about PV acceptance testing
When should the inspection be commissioned?
Early enough for documents to be reviewed, access to be arranged and inspections to be scheduled before the planned handover. The appropriate date depends on construction progress and on which examinations are already possible.
Is the technical acceptance inspection a complete system inspection?
The agreed scope is decisive. A documentation and visual inspection does not automatically include all electrical measurements or complete thermography. Before commissioning, it is determined which areas and methods are included.
Can ISZ check that identified defects have been remedied?
Yes, a follow-up inspection can be agreed as a separate step. It relates to the defined points and documents their condition at the time of the renewed examination. This keeps it traceable what has been inspected and what has not yet been finally clarified.